R1 Task 22 turns the Rust crates into the deployable worker. The worker must survive a deploy (SIGTERM) without losing or burning work, refuse to analyse with the wrong engine, and ship as a small, locked-down image.

  • One process, one runner per job kind: import (concurrency 2, no hard timeout: the handler owns its 30-minute idle deadline), analyse (concurrency = engine pool size, hard timeout 11 min over the handler’s own 10-minute deadline) and reconcile (concurrency 1, hard timeout 5 min). The pool size is WORKER_POOL_SIZE (passed through compose; .env.example sets 8 for a desktop), else min(cores - 2, 8) and at least 1, so a backfill cannot saturate the machine. The database pool has pool_size + 8 connections (budget in worker/src/start.rs), and every connection asks the server for TCP keepalives (60/10/3 s).
  • Boot order: check that STOCKFISH_PATH is Stockfish 19.x (the sf19-n300k-v1 protocol is pinned to it; anything else is a typed StartError and exit 1), adopt a Drizzle database and migrate it, connect, start the engines and the runners, schedule the reconcile. A failed step closes what the earlier ones created.
  • Shutdown (25 s grace; compose stop_grace_period: 30s): stop claiming, drain for 60 % of the grace, then close the engine pool (in-flight analyses put their game back to pending and release their job without using an attempt, even on the final attempt), drain until 90 %, then force the runners: the 90 %-100 % window bounds the wait for their handlers (cancel, then abort, even a handler that ignores cancellation), and then release_owned always runs to completion, bounded only by the queue’s query timeout and the hard deadline below, not by the window. (Amended 2026-11-22: the release used to get only what was left of the window, at least 50 ms. On a loaded host that write took longer, was dropped, and left the job leased for a whole lease and charged a stall.) Then close the engines and the database pool. Every step is bounded by the remaining budget (at least 100 ms); exit code 1 only if a close failed or timed out. That 100 ms floor lets the steps overrun the grace slightly, so the whole shutdown also has a hard deadline at grace + hard_after (25 s + 3 s = 28 s, before the 30 s SIGKILL): whatever is still running is dropped, the code is 1 and the process exits; jobs not yet released are reclaimed when their lease expires. SIGTERM and SIGINT start it once; later signals are logged and ignored.
  • Config is safe to log: WorkerEnv has a hand-written Debug that shows the database URL with its password replaced by *** and the Lichess token only as Some("***").
  • Batched enqueue: Queue::enqueue_many inserts many jobs of one kind in one statement with the same columns and live-only dedupe rule as enqueue, under the queue’s statement timeout, with one NOTIFY per batch. The reconciler uses it with the analyse job’s own options.
  • on_dead generation fence: a dead-lettered analyse job does not mark its game failed while the game is analysing with a heartbeat younger than three heartbeat periods (30 s): that is a live run, possibly of a newer generation. A stalled run is always older than that (lease plus stall grace, 85 s).
  • Import runs are status-fenced: finish and fail only touch a run that is still running, so a run the reconciler closed for a stale heartbeat stays closed.
  • Runtime image (backend/Dockerfile target worker): cargo-chef planner and builder stages, then debian:bookworm-slim pinned by digest with ca-certificates, the checksum-pinned Stockfish 19 and the worker and cli binaries; USER 10001, no ports, no CONTACT_EMAIL (ADR 0043). Logs are JSON lines on stdout with "service":"worker"; LOG_LEVEL=silent turns them off, otherwise RUST_LOG filters.
  • A deploy never burns a job attempt: a job interrupted by shutdown is released and re-run by the next worker. It does still count against the game’s games.analysis_attempts, which every claim increments (the attempt fence, ADR 0035): an interrupted run is one of the game’s MAX_ANALYSIS_ATTEMPTS (6) after which the reconciler fails it. Frequent restarts mid-analysis can therefore exhaust a game; deferred to T23/T24.
  • A hard-timed-out analysis whose handler never winds down leaves its game analysing; the reconciler’s stale sweep (10 min) resets or fails it.
  • Writes of an import are still not routed through its lock connection: if that connection dies mid-import, a re-claimed job can overlap the old handler (T21 limitation, deferred to T23/T24).
  • Bumping the Debian base means updating the digest by hand.